Alameda Municipal Power Rate Schedules

Print

Schedule MU-3
Municipal Electric Service - AMP Accounts

Applicability

This schedule is applicable to electric service rendered to Alameda Municipal Power (AMP).

Rates
  1. STANDARD METERED SERVICE
    Monthly Charges
    Distribution Public Purpose Generation Total
    per kWh $0.05648 $0.00300 $0.07209 $0.13157
    Customer Charge $10.00 - - $10.00
  2. UNMETERED UTILITY SERVICE
    Monthly Charges:
    Distribution Public Purpose Generation TOTAL
    per kWh $0.05648 $0.00300 $0.07209 $0.13157
    Per service location $5.00 - - $5.00
State Taxes

To the above charges will be added any applicable state and local taxes (refer to Rider ERS for current tax rate) and charges for the state solar PV program (refer to Rider PV).

Definitions and Special Conditions
  1. DISTRIBUTION CHARGE
    The charge for low voltage delivery of electric power at the local level, including billing and metering costs.
  2. PUBLIC PURPOSE CHARGE
    The California state-mandated charge supporting funding of energy efficiency, new renewable resources, low income and research and development programs.
  3. GENERATION CHARGE
    Charge recovering the cost of providing energy supply including generation and transmission costs.
  4. UNMETERED UTILITY SERVICE
    For multiple locations of essentially identical services, such as nodes/amplifiers for telecommunications service, remote transmitting units for utility SCADA systems, or cathodic protection rectifiers for natural gas or water pipelines, where the electric consumption is roughly consistent at each separate location, AMP will sample-meter a small number of locations of such utility service equipment to provide representative usage and billing data. The remaining locations may be unmetered and will be billed based on either a) the average consumption measured at the sample-metered site(s), or b) the calculated consumption estimated from the equipment specifications and usage profile, as determined by AMP. The sample-metered site(s) will be billed at the Standard Metered Service rates, and the remaining unmetered sites will be billed at the Unmetered Utility Service rates. The customer is required to notify AMP in the event of any equipment modifications, upgrades, changes, replacements, or any other event that would materially impact electrical consumption at the unmetered locations. AMP reserves the right to inspect the equipment at each location to verify equipment type, specifications, or consumption estimates and to ensure the account is being properly billed.
  5. RULES and REGULATIONS
    Other conditions, as specified in AMP's Rules and Regulations, shall apply to this rate schedule.

ADOPTED: June 28, 2010
RESOLUTION NO. 4844
Effective July 1, 2010
(Superseding Rate Schedule MU-3 Effective July 1, 2008)

  • Call (510) 748-3900 for Customer Service 24/7
  • Privacy Policy
  • Copyright © 2002-12 Alameda Municipal Power