Alameda Municipal Power Rate Schedules

Print

Schedule MU-2
Municipal Electric Service - Street Lighting

Applicability

This schedule is applicable to electric service rendered to the City of Alameda municipal accounts for the street lighting system.

Rates
Monthly Charges
Distribution Public Purpose Generation Total
per kWh $0.07363 $0.00300 $0.06725 $0.14388
Customer Charge $98.00 - - $ 98.00
State Taxes

To the above charges will be added any applicable state tax (refer to Rider ERS for current rate).

Definitions and Special Conditions
  1. DISTRIBUTION CHARGE
    The charge for low voltage delivery of electric power at the local level, including billing and metering costs.
  2. PUBLIC PURPOSE CHARGE
    The California state-mandated charge supporting funding of energy efficiency, new renewable resources, low income and research and development programs.
  3. GENERATION CHARGE
    Charge recovering the cost of providing energy supply including generation and transmission costs.
  4. OPERATING and MAINTENANCE EXPENSES
    This rate includes the normal distribution expenses for operating and maintaining the City of Alameda street lighting system, including lamps and globes used for replacements. This rate does not include damage claims.
  5. UNMETERED STREET LIGHTS
    Where street lighting is not metered and operates under local photo electric control, the unmetered kWh amount will be calculated by Alameda Municipal Power's (AMP's) Engineering Department, and added to the metered kWh amounts for billing purposes. All kWh's, both metered and calculated, shall be combined on one bill for the complete street lighting system.
  6. RULES and REGULATIONS:
    Other conditions, as specified in AMP's Rules and Regulations, shall apply to this rate schedule.

ADOPTED: June 28, 2010
RESOLUTION NO. 4844
Effective July 1, 2010
(Superseding Rate Schedule MU-2 Effective July 1, 2004)

  • Call (510) 748-3900 for Customer Service 24/7
  • Privacy Policy
  • Copyright © 2002-12 Alameda Municipal Power