Alameda Municipal Power Rate Schedules

Print

Schedule D-1
Residential Service

Applicability

This schedule is applicable to single-phase residential service for single-family dwellings and multi-family dwellings separately metered by Alameda Municipal Power (AMP). Service to common areas of multi-family accommodations is not applicable under this schedule.

Rates
Monthly Charges
Distribution Public Purpose Generation Total
Tier I:
Baseline Quantities, per kWh
$0.04955 $0.00300 $0.05032 $0.10287
Tier II:
101-130% of Baseline, per kWh
$0.05335 $0.00300 $0.06201 $0.11836
Tier III:
Over 130% of Baseline, per kWh
$0.08452 $0.00300 $0.09960 $0.18712
Customer Charge $1.40 $1.40
State and Local Taxes

To the above charges will be added any applicable state and local taxes (refer to Rider UUT and Rider ERS for current tax rates) and charges for the state solar PV program (refer to Rider PV).

Definitions and Special Conditions
  1. BASELINE RATES
    Baseline rates are applicable only to residential usage billed under a residential rate schedule.
  2. DISTRIBUTION CHARGE
    The charge for low voltage delivery of electric power at the local level, including billing and metering costs.
  3. PUBLIC PURPOSE CHARGE
    The California state-mandated charge supporting funding of energy efficiency, new renewable resources, low-income, and research and development programs.
  4. GENERATION CHARGE
    Charge recovering the cost of providing energy supply including generation and transmission costs.
  5. TIER I (BASELINE) & TIER II (101-130% of BASELINE) QUANTITIES
    Baseline quantities vary for summer and winter season and depending on the primary heat source (gas or electric). The following quantities of electricity are to be billed at the Tier I and Tier II rates:
    PRIMARY HEAT SOURCE SEASON BILLING CODE Tier I kWh
    Per Dwelling Unit
    PER MONTH
    Tier II kWh
    Per Dwelling Unit
    PER MONTH
    NATURAL GAS/OTHER Summer B 259 260-336
    NATURAL GAS/OTHER Winter B 310 311-404
    PERMANENTLY INSTALLED ELECTRIC HEAT Summer H 317 318-412
    PERMANENTLY INSTALLED ELECTRIC HEAT Winter H 581 582-756
  6. TIER III (OVER 130% of BASELINE)
    All usage in excess of Tier II will be billed at the Tier III rates.
  7. SEASONAL RATE CHANGES
    Summer and winter Tier I and Tier II quantities will normally be billed without seasonal proration for six consecutive billing periods starting with the beginning of the May and November billing cycles, respectively.
  8. MINIMUM MONTHLY CHARGES
    Monthly charges shall not be less than $5.00.
  9. RULES and REGULATIONS
    Other conditions, as specified in AMP's Rules and Regulations, shall apply to this electric rate schedule.

ADOPTED: June 28, 2010
RESOLUTION NO. 4844
Effective July 1, 2010
(Superseding Rate Schedule D-1 Effective July 1, 2008)

  • Call (510) 748-3900 for Customer Service 24/7
  • Privacy Policy
  • Copyright © 2002-10 Alameda Municipal Power